    The £2,500 air-to-air heat pump grant: where it actually stands

    The grant is real and it is in the scheme rules. It is not yet claimable. The government's Boiler Upgrade Scheme now lists £2,500 towards an air-to-air heat pump, but no installer can be certified to fit one under the scheme until MCS finishes bringing air-to-air into its certification, and that has not happened yet. Anyone advertising £2,500 off an air conditioning quote today cannot deliver it.

    This page is deliberately unglamorous. We would rather be the source that gets it right than the one that gets the click.

    What is confirmed

    The Boiler Upgrade Scheme is the government grant scheme for replacing fossil fuel heating. Its published grant amounts now read:

    AmountTechnology
    £7,500An air source heat pump, the air-to-water type that feeds radiators or underfloor heating.
    £7,500A ground source heat pump, including water source and shared ground loops.
    £5,000A biomass boiler.
    £2,500An air-to-air heat pump, the technology behind reversible air conditioning.

    There is also an extra £1,500 available until March 2027 for air or ground source heat pumps where the property is off the mains gas grid and currently runs on oil or LPG.

    The general conditions are already set. You must own the property, which can include a second home or one you let out. You must be replacing a fossil fuel heating system — oil, gas, electric or LPG. Most new builds and social housing are excluded. And the installation has to be commissioned within 120 days of applying.

    What is still missing

    One thing, and it is the thing that matters: the certification route.

    To claim any Boiler Upgrade Scheme grant, the work has to be done by an installer certified under MCS, the Microgeneration Certification Scheme. Air-to-air heat pumps have not historically been within MCS's scope, and bringing them in is a process rather than a switch.

    December 2025

    MCS rewrote its rules so that they cover this type of system for the first time. It called this an important step with more to follow.

    April 2026

    MCS said the remaining hold-up is that the organisations who approve installers have to be approved themselves first, and that this is taking varying amounts of time.

    August 2026

    the £2,500 appears on the government's own page as a grant you can get. MCS still says the approval route opens "later this year".

    So the money is agreed and the plumbing behind it is nearly finished. What nobody can currently give you is a date.

    What this means if you are planning an installation

    Three honest positions, depending on where you are.

    If your job is urgent — a room that is unusable in summer, a plant room down, an extension finishing next month — do not wait. There is no confirmed opening date, and holding a project for an unspecified scheme is a poor trade against a summer you cannot use the room.

    If your job is flexible and you are replacing fossil fuel heating, it is worth a conversation. The eligibility rules already published are clear enough to tell you whether you would be likely to qualify, and knowing that changes the sums.

    If you are somewhere in between, the practical step is to have the survey done now and the design ready, so that if the scheme opens you are in a position to move rather than starting from scratch. [SURVEY TERMS TO BE CONFIRMED]

    Where HTC stands on certification

    The published requirement is that the installing business has a supervisor qualified in refrigeration, air conditioning and heat pumps to Level 3 or above. That is the qualification our trade already works to. We are a refrigeration and air conditioning contractor, F-Gas registered under number 2004080, and this is what we install every week rather than a sideline.

    [HTC's MCS POSITION TO BE CONFIRMED — leave this bracket visible]

    Why we published this before it was live

    Because the figure is already being advertised locally as though you could claim it, and you cannot. If you have been quoted with £2,500 knocked off on the strength of this grant, ask the installer for their MCS certificate number for air-to-air heat pumps. As things stand, they will not have one.

    We will update this page when the scheme opens, and we will tell anyone with a live quote at the time.

    Common questions

    No. The grant is in the scheme but not yet claimable, because MCS certification for air-to-air is not open.

    No. The £7,500 is for an air-to-water heat pump, which feeds radiators or underfloor heating and replaces your boiler. The £2,500 is for air-to-air, which is what most air conditioning is.

    The scheme is for replacing fossil fuel heating: oil, gas, electric or LPG. That is a published condition of the scheme as a whole.

    The Boiler Upgrade Scheme covers England and Wales. Scotland and Northern Ireland run their own schemes on different terms.

    Yes. This page gets updated, and anyone with an open quote hears from us directly.

    Planning an installation and want to be ready?

    Book a survey and we will set the job up so it can move quickly if the scheme opens. Call 03453 022 969.

    Sources: gov.uk Boiler Upgrade Scheme; MCS. Reviewed by [ENGINEER NAME], F-Gas registered, HT Cooling Ltd. Published [DATE]. Last checked [DATE].

    HT Cooling Ltd

    Established air conditioning, refrigeration and HVAC contractors serving commercial, industrial and domestic clients across London and the Home Counties.

    Services

    Contact

    Accreditations

    F-Gas RegisteredConstructionline GoldAcclaim (SSIP)SMAS Worksafe

    © 2026 HT Cooling Ltd. All rights reserved.

    Office: Bourne Holdings, Broadway Road, Lightwater, Surrey GU18 5SH

    Registered in England and Wales. Company No. 13378090. VAT No. 382854660. Registered office: 7b Curley Hill Road, Lightwater, Surrey GU18 5YG.

    We use cookies for essential site functionality, and in future for analytics to improve our service. You can accept or reject non-essential cookies at any time. See our Privacy Policy for details.